AMCC 3WARE 9650SE Installationsanleitung Seite 31

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 42
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 30
Tools and equipment required
www.3ware.com 27
Tools and equipment required
Slot-head screwdriver
Grounding strap
Battery Backup Unit (BBU) and battery
3ware 9650SE series controller
Installation Overview
The Battery Backup Unit (BBU) is comprised of two pieces: the
battery module and the BBU control module.
These pieces attach to the controller at the points illustrated in
Figures
19 through 21:
a Clips on the battery module match to slots on the half-height
controllers (4-port and 8-port) and holes on the full-height
controllers (12-port and 16-port).
b Connector on the BBU mates to receptacle on the controller.
c Post on the BBU mates to post hole on the controller.
Figure 19. Points of connection on the BBU
a) Clips
b) BBU connector
c) Post
Seitenansicht 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 41 42

Kommentare zu diesen Handbüchern

Keine Kommentare